In this final part of our Casa Kuun series, we walk through the architecture construction process behind a cast-in-place concrete house in Puerto Escondido. From improving the soft coastal soil to building the rebar cage and pouring tinted concrete, we share how careful planning, close collaboration with the builders, and plenty of triple-checking brought the design to life.
To wrap up our 3-part series on Casa Kuun, we’ll dive into the construction stage. We’ll explore how the Puerto Escondido environment and the cast-in-place concrete design influenced the building process - from preparing the soil to pouring the concrete. Hint: it takes a lot of planning, coordination, and triple checking!
Selecting a contractor: The best partnerships between architects and contractors are based on mutual respect.
We reached out to several contractors in Puerto Escondido to get multiple bids. We were looking for a partnership based on mutual respect for each other’s expertise. As architects we help create the vision, and the contractor brings understanding and expertise of the local construction practices. We teamed up with Arquitectura Modular’s construction team. We liked how they talked about their projects – with soul! They expressed a personal connection to their work. We’re super pleased with the final results of Casa Kuun and the fidelity to the vision that Arquitectura Modular delivered.
The building sequence: When building with concrete, concrete comes last.
To start, after our geotechnical engineer completed the soils studies, we had to improve the soil. Since we were building along the Oaxacan Pacific coast, which has a very high water table, soft soil, and seismic activity, we needed to prepare the ground with 40 inches of engineered layers of crushed rock and compacted aggregate to create a stable base for the foundations.
Next, we prepared the walls. When building cast-in-place concrete walls, you have to create a big mold system known as “formwork” to hold and shape wet concrete until it hardens and gains enough structural strength to support itself. To define doors, windows, and vents, you create frames of the voids in the formwork. All the mechanical, electrical, and plumbing (MEP) need to be in place before the concrete is poured, because once the concrete is poured and cured, there is no going back. After MEP comes the rebar. You build a cage of rebar that acts like bones, holding the wall upright. The final step is to verify the mix and pour the concrete. When we poured the first walls, we checked everything a million times, to make sure the outlets were in the right place, the pipes were laid at the right slope for water to run through, etc.
Once the first floor was done, we built the second floor in a similar way.
Working with concrete can be straightforward, but requires planning, coordination, and diligence. The concrete is actually the last piece of the puzzle.

Overcoming challenges: concrete doesn’t lie.
Each project has its unique challenges. With cast-in-place concrete, the material is very honest. It records everything that happens in the construction process. If the formwork is done poorly, it will show.
One key step when working with cast-in-place concrete is to remove the entrapped air. The freshly poured concrete needs to be “consolidated” for the material to settle – a concrete vibrator is used to push the air bubbles to the surface. This results in improved structural performance and appearance. Too much vibration, however, can cause segregation, where the heavier aggregates settle in the bottom (gravel and sand) and the cement and water rise to the top. It takes careful timing and attention to visual cues to perform this step correctly.
The team also needed to be diligent in mixing the color that was added to the concrete. Rather than relying on surface paint that can chip and look out of place on concrete, BELO Design was really excited to incorporate the color into the concrete mix, making it integral and unchippable. I was inspired when visiting Queretaro, Mexico. I saw examples of tinted concrete that worked really well. But each batch had to be consistent or the concrete would reveal that too.
With such a painstaking process, another architect might have quit a long time ago. At BELO, we view these concrete qualities as opportunities to imprint character and demonstrate excellence.

What worked well: collaboration and coordination.
Since BELO Design manages remote projects (in addition to in-person projects in the DC/Maryland/Virginia area), I prioritize using the best software (Rhinoceros 3D and Autodesk Revit) to convey the intention of the design with 3D models. The drawings show where all the plumbing and electrical should be routed to help the team on the ground.
We didn’t just hand off the drawings. We continued to collaborate with the builders. It was an ongoing process of reviewing and discussing and defining details as we went. We’d hop on a Zoom call to look at the drawings and models.
All the outputs were coordinated well before we poured the first wall. My goal is to avoid as many onsite issues as possible. It’s easier to solve when you plan ahead of time, rather than onsite during construction. Questions come up, no matter how much work you do before, but we are as diligent as possible to avoid issues that are avoidable.
Advice for those interested in using concrete in their home or remodel: do it.
Concrete has many great qualities, but it requires you to do your due diligence. For example, it requires you to coordinate your project well and create as many mockups as possible. Whoever wants to work with concrete needs to embrace the natural character of the concrete instead of trying to cover it up. It becomes the structure and the finish.
I would dare to say that the architect should design based on the limitations that concrete has. Understand how it works and design based on that, not the other way around.
Conclusion: everything is connected.
Casa Kuun has reinforced something I already believed: architecture gets much more interesting when you stop treating the building as an isolated object. Here, you can't ignore the climate. You can't ignore water. You can't ignore structure, landscape, craftsmanship, logistics, or the people actually constructing the building. Everything is connected.
And because construction requires constant collaboration among everyone involved, it also reinforced how much architecture depends on relationships.
Some of the best decisions on Casa Kuun didn’t come from one person having the perfect idea. They came from everyone around a table trying to solve the same problem well.